RESUME

JOHN PAT BOYD, P.E.

Box 568- Alva, Oklahoma 73717

580-327-2416 Fax 240-525-8157 boydengr@swbell.net

PERSONAL: Born 08/27/52 Mangum, OK.  Married with two kids at home.  6’ 2”, 250#, exc health

EDUCATION:  UNIVERSITY OF OKLAHOMA: BS Petro Engr 5/1980 & PE in 1990.  Mud, Bit, Stuck Pipe, H2S, Completion, BOP(MMS-08/02), Haz Wop&Com, ASA, First Aid/CPR, “STOP”, Hearing, Breathing, Eye, Fire, Fall, PPE & CSE trained.  US passport.  Do DEAP, DIMS, Word, Excel, etc.  Proactively safe.

EXPERIENCE:

Total E&P USA/Cigna Engineering-February, 2003 to Present- Rio Grande Valley, South Texas

    Drlg Rig Supr-South Texas 14,500-20,000’ HTHP, casing drilling-directional.

BP America/Eaton Engineering & Consulting-February, 2001 February, 2003-Houston, Texas

Drlg Engr-Design, AFE, oversee MidCont UBD/OBM/ML’s/PDC/Tech Limits directional to 21,000’

Completion Engineer-Design & supervise HP-HR frac’s, snubbing, CT, flow tests-Tech Limits

Mewbourne Oil Co-Woodard, OK-April,1999 to February, 2001

    Drlg Rig Supr-West Texas, Panhandle Texas, SE New Mexico & Oklahoma  6,500’ - 13,000’      

    Completion Rig Supr-Multi-zone, CT & conventional, HP acid & frac, snubbing, H2S

    Workover Rig Supr-H2S, casing leaks, rod / tubing jobs, foam-air cleanouts, re-completions

    Sr. Petro Engr-Drilling & completion design, planning & supervision

BP Alaska/FAIRWEATHER E&P SERVICES, INC.-Anchorage, AK-November, 1997 to January, 1999-

    Badami Eastern North Slope Alaska-isolated shore camp

          Drlg Rig Supr-16,000’ MD / 10,500’ TVD,  sidetracks,  open-hole tri-laterals, G&I, MWD /

                LWD / DPC in over-pressured H2S oil reservoir, fishing – Tech Limits

          Completion Supr (drilling rig)-Multi-laterals, slotted liners & gas lifts.  Wireline, slickline, CT,      

                flow-test intensely SIMOP’d with drilling & production.

          Drlg Engr Review Committee-Safety, planning & costing with supt’s.

    Prudhoe Bay Unit “W” Pad-

          Drlg Rig Supr-20,900’ MD sidetracks, 7,500’ horizontal section

          Completion Supr (from drilling rig)- Ran & cemented long liners.  DPC perforate.  SIMOPS.

BOYD ENGINEERING-Alva, OK-January, 1984 to January, 1998-Petroleum Engineer, Consultant-Engineer & rig supervise drilling, completion, work over, re-entry, remedial  & production operations for many clients & locations as follows:

    Mari Gas Deep II in Thar Desert, Pakistan-

          Drlg Rig Supr- 12,000’ HPHT exploration well.  PDC, packed-hole, DST’s.

    Questar Expl-Texas & Okla Anadarko Basin-     

          Drlg Rig Supr  10,000-12,000’ multi-cased, weighted mud, well control, fishing

    Louis Dreyfus Natural Gas-North Texas Panhandle

          Drilg Rig Supr -10,000-13,000 lost circulation + gas, snubbing

          Completion Rig Supervisor- Multi-zoned CT & conventional.  HP acid & casing frac, flow & snub.  

    EOG-NW Oklahoma-

          Drilg Rig Supr-10,000’

          Completion Rig Supr- Multi-zone isolations, fracs, UB clean-out, commingle.

    Samson Resources -NW Louisiana, SE & W Okla, Texas Panhandle-

          Drlg Rig Supr-  8,800-12,500’, multi-cased, over-pressured, directional.

          Workover Rig Supr-Sidetrack cased or OWWD abandoned holes for re-completions.

    Oryx-

          Drlg Rig Supr-SE Oklahoma- 8,800’ UBD air hammer / rotary while flowing gas

    Completion Rig Supr- Multi-zoned CT & conventional.  HP acid & casing frac.  Flow test.                    Snub, UB commingle & hook-up to sales.  Fishing.

          Workover Rig Supr-Anadarko Basin-16,500’ foam-air, fishing, stripping, HP frac.

John Pat Boyd, PE Page # 2 of 2

    Vastar/Arco-SE Oklahoma Arkoma Basin

          Drlg Rig Supr-8,800-13,500’-UBD air hammer / rotary, OBM, directional.

          Completion Rig Supr- Multi-zone rigless wireline / CT.  HP acid & casing frac.  Snub high                flowrates.  Foam-air / N2 cleanouts.  Flow tests.  Fishing.

    Marmik Oil-

       Drlg Rig Supr-NW Oklahoma, SW Kansas-5,500-8,000’

       Completion Rig Supr-TCP, acidize, casing frac, snubbing, construction

       Workover Rig Supr-Rod/tubing jobs, casing leaks, re-completions, commingles, deepenings

       Drlg & Prod Engr-design, planning & supervision, regulatory, environmental

    Axem Resources-

       Drlg Rig Supr-NW Oklahoma, SW Kansas, E Colorado-5,500-8,000’, enviro sensitive

       Completion Rig Supr-acide, binary foam casing frac, UB foam-air clean-outs           

       Workover Rig Supr- Rod/tubing jobs, casing leaks, re-completions, commingles, deepenings

    GADSCO/Dune Resources, Noble Affiliates-

       Drlg Rig Supr-N, S, SW, NW & Central Oklahoma

       Completion Rig Supr-Wireline, casing frac                  

       Workover Rig Supr- Rod/tubing jobs, casing leaks, re-completions, commingles

    Pen-Ocean Oil-Lagos, Nigeria

       Workover Rig Supr-WOR reduction for 10,500’ x 9 5/8” dual, selective high flow oil well

O.I.L. Energy -Dallas, TX-July, 1982 to January, 1984 –

    Division Drlg & Prod Engr-Supervised central/western Oklahoma, Oklahoma Panhandle, Rocky Mountain, south/west Texas & Louisiana Gulf Coast drilling, completion & workovers to 22,000’ MD.  Production/reservoir engineering monitoring for ~250 wells with company rigs & a staff of engineers, foremen, clerks, technicians, pumpers & contract consultants.

    Drlg & Prod Engr-Oklahoma City, Oklahoma

    Completion Foreman, Oklahoma City, Oklahoma

BOYD CONSULTING-Oklahoma City, OK- June, 1981 July, 1982 – clients & locations as follows

    Continental Resources- Drlg Rig Supr-9,000-18,000’ multi-cased, Anadarko Basin HPHT gas wells

    Amarex - Drlg Rig Supr-16,000 –18,000’ multi-cased, Anadarko Basin HPHT gas wells

    DI Energy (Drillers, Inc.)-

          Drlg and Prod Engr-Design, planning, AFE’s, supervision

          Drlg Rig Supr-17,500’ multi-cased, Anadarko Basin HPHT gas wells

          Completion Supr (from drilling rig)-Wireline, slickline, HP frac

    Trigg Drilling-

          Drlg Rig Supr-16,500’ multi-cased, Anadarko Basin HPHT gas wells

          Completion Rig Supr- Wireline, slickline, HP acid and frac.  Up to 18,000’ Anadarko Basin

          Workover Rig Supr-Re-completions, clean-outs, tubing / rod jobs

TENNECO OIL COMPANY-Oklahoma City, OK-January, 1980 to June, 1981-

    Drlg Rig Supr-Kansas, Texas & Oklahoma up to 22,500’ Anadarko Basin.

    Completion Rig Supr-completions and workovers

    Drlg Engr- Drilling, completion & workover planning, AFE’s, reports, supervision

BEFORE AND DURING COLLEGE: 1973-1980  Test well at University of Oklahoma BOP School; labor for Deep Drilling Research Program; Warehouseman at Core/Sample Library; Rig supervisor for Ed Prier, Inc. in Norman, OK; Worked floors, motors & derrick for H&P, Rowan, Robinson Bros. & Top Drilling in central & western Oklahoma;  Rental, fishing & BOPE helper/truck driver for Acme Tool in Oklahoma City.  Warehouseman, jar-hand & hydraulics mechanic for Bowen Tools in Oklahoma City;   Driver for Muse Trucking Co.;  Frac, acid, cement operator for Halliburton in Enid, OK.

MEMBERSHIPS: Nat’l/State Societies of Professional Engineers, Society of Petroleum Engineers, American Petroleum Institute, Society of Professional Well Log Analysts, Oklahoma City Geological Society & ISOFT.

setstats 1